
Construction and function of the sprayer boom
6.2
Super-L
boom
Fig. 95
Fig. 95/...
(1) Sprayer boom with spray lines
(2) Transport safety bow
(3) Parallelogram frame for adjusting the height
of the sprayer boom
(4) Nozzle protection tube
(5) Spacer
(6) Outer boom locking, see Seite 106
(7) Swing compensation, see page 105
(8) Valve and switch tap for DUS system
(9) Boom equipment, see Fig. 96
Fig. 96/...
(1) Pressure connection for the spraying-
pressure pressure gauge
(2) Flow meter for determining the spray rate
[l/ha]
(3) Return flow meter for determining the spray
liquid that has been fed back into the spray
liquid tank (Control terminal only)
(4) Motor valves for switching the boom part
width sections on and off
(5) Bypass valve
(6) Pressure relief
(7) Pressure sensor
Fig. 96
110
UX Super
BAG0054.10 11.16