
Using the machine
Blending in the agent:
(Blending in the agent via ECO-Fill, see page
167.)
8. Open the induction bowl lid.
9. Close switch tap
L
.
10. Move the pressure gauge switch tap
A
to
position
.
11.
Open switch tap
D
12. Move switch tap
E
to position
.
13. Move switch tap
F
to position
While blending in the agent, the supply
of water and the suction speed can be
adjusted using switch taps
E
and
F
.
14. Pour the quantity of agent calculated and
measured for filling the tank into the induc-
tion bowl.
→
The content of the induction bowl is evacu-
ated.
To increase the user's protection, for
example when handling powder
agents, first pour the agent into the
induction bowl (maximum 50 l), close
the lid, and only then
switch tap
F
to position
and
switch tap
E
to position
.
UX Super
BAG0054.10 11.16
165