![AMA KE 6002-2 Original Operating Manual Download Page 26](http://html1.mh-extra.com/html/ama/ke-6002-2/ke-6002-2_original-operating-manual_2915711026.webp)
The tines
2
are fastened to the sockets
1
of the
tool carrier. The sockets are shaped in such a way
that the tines have a spring action and can deflect on
rocks and other obstacles.
CMS-I-00002948
For operation as a seeding combination, the soil
tillage implement can be combined with a pack top
seed drill.
4.3 Special equipment
Centre line eradicator
Lighting and identification for road travel
Gear wheel change set 31/40 teeth
Rollers
4.4 Protective equipment
4.4.1 Universal joint shaft guard
As standard, the universal joint shafts are equipped
with guard tubes
2
and protective sleeves
1
.
Depending on the implement equipment, holding
chains or full guard cones fix the guard tubes. This
rules out the risk of winding.
2
1
CMS-I-00002930
CMS-T-00010139-A.1
CMS-T-00010014-A.1
CMS-T-00003992-C.1
4 | Product description
Special equipment
MG7512-EN-GB | C.1 | 29.09.2022 | © AMAZONE
22