TM 9-2320-283-20-3
CAB AND BODY.
3-258. INSTRUMENT PANEL ASSEMBLY REPLACEMENT (Continued).
LOCATION/ITEM
ACTION
REMARKS
NOTE
Follow-on maintenance action required
(Continued):
Install glove compartment door
assembly (para 3-257).
Install instrument panel center
panel assembly (para 3-256).
Install left-hand instrument cluster
panel assembly (para 3-255).
Install right-hand instrument
cluster panel assembly (para
3-254).
Install park brake valve (para
3-171).
Install wiper lamp and washer lamp
(para 3-86).
Install trailer supply valve (para
3-175).
Install ether start decal (para
3-305).
Install park data plate (para
3-305).
Install interaxle differential
decal (para 3-305).
Install differential toggle vavle
(para 3-195).
3-1526
Summary of Contents for M915A1
Page 10: ......
Page 17: ......
Page 59: ......
Page 130: ......
Page 155: ......
Page 378: ...TM 9 2320 283 20 3 CAB AND BODY 3 264 OUTSIDE FRONT HANDLE REPLACEMENT Continued 3 1551...
Page 622: ...TM 9 2320 283 20 3 GAGES NONELECTRICAL 3 309 TACHOGRAPH REPLACEMENT Continued TA 237846 3 1795...
Page 669: ......
Page 673: ......
Page 705: ......
Page 707: ......
Page 717: ......
Page 737: ......
Page 738: ......
Page 739: ......
Page 740: ......
Page 741: ......
Page 742: ......
Page 743: ......
Page 744: ......
Page 745: ......
Page 746: ......
Page 748: ......
Page 756: ...PIN 054576 000...