TM 9-2320-283-20-3
CAB AND BODY.
3-258. INSTRUMENT PANEL ASSEMBLY REPLACEMENT (Continued).
LOCATION/ITEM
ACTION
REMARKS
1. Fifteen screws (1)
Remove from item (3).
and lockwashers
(2).
2. Instrument panel
Remove.
First mechanic lifts
assembly (3).
left side. Second
mechanic lifts right
side.
3. Instrument panel
Aline and install.
assembly (3).
4. Fifteen screws (1)
Install and tighten.
First mechanic holds
and lockwashers
(2).
item (3) while second
mechanic installs items
(1) and (2).
NOTE
Follow-on maintenance action required:
Install heater control panel (para
3-300).
Install air cleaner restriction gage
and bracket (para 3-315).
Install tachograph (para 3-309).
Install ether start switch (para
3-76).
Install pushbutton clearance lamp
(para 3-77).
Install ether lamp and clearance
lanp (para 3-85).
Install windshield wiper control
(para 3-292).
Install windshield washer control
valve (para 3-291).
3-1524
Summary of Contents for M915A1
Page 10: ......
Page 17: ......
Page 59: ......
Page 130: ......
Page 155: ......
Page 378: ...TM 9 2320 283 20 3 CAB AND BODY 3 264 OUTSIDE FRONT HANDLE REPLACEMENT Continued 3 1551...
Page 622: ...TM 9 2320 283 20 3 GAGES NONELECTRICAL 3 309 TACHOGRAPH REPLACEMENT Continued TA 237846 3 1795...
Page 669: ......
Page 673: ......
Page 705: ......
Page 707: ......
Page 717: ......
Page 737: ......
Page 738: ......
Page 739: ......
Page 740: ......
Page 741: ......
Page 742: ......
Page 743: ......
Page 744: ......
Page 745: ......
Page 746: ......
Page 748: ......
Page 756: ...PIN 054576 000...