44
•
MN-35947
•
Rev 22
•
10/22
•
Combitherm® CT PROformance™ and CT Classic Series Installation Manual
CT PROformance™ Start-Up Procedures
Grease Collection Hose
A
F
On/Off Ball Valve
Container
Fill Cap
Grease
Collection
Container
Vent
Cap
Recommended
Capacity
G
Thumb
screw
Hose guide
bracket
Hose hanger bracket with film
Hose hanger bracket
C
D
E
B
•
Grease Collection Hose Assembly is attached to the oven
in the back.
•
The hose guide bracket can be attached on either the left
side or the right side toward the back.
Placement on the
left side is recommended whenever possible.
Thumb
screws are in position for this purpose. Remove thumb
screws, position hose guide bracket and secure screws
(PHOTO A). Thread grease hose through the guide.
•
The hose hanger bracket can be attached on either
the left side or the right side toward the front of the
oven.
Placement on the left side is recommended
whenever possible.
Remove the plastic protective fi lm
from the bracket (PHOTO B,C). Pan head screws are in
position beneath the oven for this purpose.
For stacked
confi gurations, always place the hanger bracket on
bottom of the top oven.
Remove pan head screws and
washers (PHOTO D), position hose hanger bracket on
either side of the oven and secure screws and washers
(PHOTO E,F). The hanger bracket is used to secure the
grease collection hose while changing grease collection
containers.
•
Place Grease Collection Containers inside the tray of the
Mobile Grease Collection Cart. Roll into place next to the
oven and
apply the caster brake
.
•
Loosen vent cap on container.
Pull out the Grease
Collection Hose Assembly from the back of the unit.
Remove collection container fi ll cap (PHOTO G).
•
Screw Grease Collection Hose Assembly on to collection
container until snug.
•
Turn ball valve handle to the
ON
position.
GREASE COLLECTION INSTALLATION (IF EQUIPPED WITH THIS OPTION)