Operation
42
Meters and indicator lights during operation
During normal operation, each indication of instruments is shown in the table below. Refer to the table for
daily checks.
Note: The values marked * vary with location of the voltage selector switch.
Voltage Frequen
cy
Ammeter
Monitor Lamp
ELECTRICAL
TRIP
WARNING
SHUTDOWN
GLOW
Be
fo
re
St
art
CONT
POWER
SWITCH
0
0
0
●
OFF
●
OFF
●
OFF
●
PFF
During
Operation
240
*
480
60
Less than
rated
current
●
OFF
Control Panel Monitor Screen
Be sure to frequently check meters and indicators for proper operation, or any machine water, oil, fuel
leaks, etc.
The above table gives standard values. They may vary slightly depending on operating conditions and
other factors.
In single-phase load operation, check the current of L1, L2, and L3 phase with displaying [Generator
Current] page.
Each current should be balanced if unbalanced. Change load connections so the current of L1, L2, and
L3 is equally balanced. Make sure that the current of each phase does not exceed the rated one.
※
Keeping a record of machine operation and service checks in the Operation Log will help with
discovering any underlying issues or problems with the machine before they become severe.
Summary of Contents for Maxi-Power MP65 T4F
Page 65: ...N o t f o r R e p r o d u c t i o n 65 Dimensions units in...
Page 66: ...N o t f o r R e p r o d u c t i o n 66 ALLMAND COM Dimensions units mm...
Page 67: ...N o t f o r R e p r o d u c t i o n 67 Generator Wiring Diagram...
Page 68: ...N o t f o r R e p r o d u c t i o n 68 ALLMAND COM Engine Wiring Diagram...
Page 69: ...N o t f o r R e p r o d u c t i o n 69 Connector Terminal Arrangement...
Page 74: ...N o t f o r R e p r o d u c t i o n 74 ALLMAND COM...