17
Operation
25
Connecting Loads
Select a cable with sufficient diameter by considering the load capacity and the distance from the generator
to the load. Use terminals for connection and securely fasten them.
A180817
After checking phase number and voltage of the load,
make sure to connect them correctly.
---Terminal Size--
Three-phase output
(L1,L2,L3,N)
M14
Ground terminal(G)
M14
A180557
Install a load switch between the output terminal and the
load to switch on/off the load. Do not switch the load
on/off directly by the circuit-breaker of the generator. It
could cause damage to the circuit-breaker.
Connect the connecting cable to the load so that the
output terminals should not touch each other.
When removing or connecting a connecting cable for changing
load, be sure to switch OFF the circuit breaker, remove the starter
key from the starter switch, then carry out a work. The operator
must keep the key during operation.
For a connecting cable to load, do not use a cable with damaged
sheath nor an inappropriate insulation cable to the voltage.
Secure connections between each cable terminal and
input/output terminal. Otherwise, it may be slackened during
operation and may cause a fire or an electric shock accident.
3 Phase terminal
Ground
Load Switch
Summary of Contents for Maxi-Power MP65 T4F
Page 65: ...N o t f o r R e p r o d u c t i o n 65 Dimensions units in...
Page 66: ...N o t f o r R e p r o d u c t i o n 66 ALLMAND COM Dimensions units mm...
Page 67: ...N o t f o r R e p r o d u c t i o n 67 Generator Wiring Diagram...
Page 68: ...N o t f o r R e p r o d u c t i o n 68 ALLMAND COM Engine Wiring Diagram...
Page 69: ...N o t f o r R e p r o d u c t i o n 69 Connector Terminal Arrangement...
Page 74: ...N o t f o r R e p r o d u c t i o n 74 ALLMAND COM...