
Allied Construction Products, LLC www.alliedcp.com
SOMM577202_14mar
28
9.0 Attach / Remove Breaker From Carrier –
[cont’d]
PPE including Safety eyewear & gloves
Sledge
Hammer
Drift
pin
3/4 drive socket wrench
3/4 drive metric sockets
Grease
gun
Standard and Metric open end wrenches
Pry
bar
Rags
1. Operator: Move carrier and Breaker to a firm
level surface. Position the Breaker horizontally
with the hose side up and the breaker tool
pointing toward the carrier.
2. Shut the carrier off and relieve the pressure in the
hydraulic tank and hydraulic lines.
3. Assistant: Check that the Breaker is stable and
all loads are supported. Close the shut off valves
on the carrier that's connected to the Breaker.
4. Clean dirt from connection areas. Disconnect the
hoses from the shut off valves. Seal all open
connections with the appropriate plugs and caps.
5. Remove the pin retainers from the stick and link
pins. Collect any spacers that may have been
used.
6. Refer to Section 8.0 for proper storage
instructions.
Summary of Contents for Hy-Ram HR270
Page 60: ...SOMM57720214mar R ...