
Allied Construction Products, LLC www.alliedcp.com
SOMM577202_14mar
ix
Table of Contents - [cont’d]
SECTION
Pg.
7.4.3 Front Head Inspection – Internal Parts…….
20
7.4.4 Tool & Bushing - Measure Wear……………
19
7.5 Piston Inspection……………………………..
20
7.6 High-Pressure Accumulator…………….…….. 20
7.7 Inspect Mounting Pins…………………....…… 20
7.8 Threaded Fastener Inspection……………….
20
7.9 Inspect Hoses………………………………...
20
7.10 Check Oil & Filter on Carrier…………….…..
22
7.11 Measuring Oil Pressure………………….….. 21
7.11.1 Safety Precautions – Read First………..…
21
7.11.2 How To Measure Oil Pressure……………
22
8.0 Safe Handling & Storage…………………….
23
8.1 Transport Breaker Independently of Carrier…
23
8.2 Transport Breaker Installed on Carrier……….
23
8.3 Breaker Storage – Short Term (<14 days )…
23
8.4 Breaker Storage – Long Term (> 14 days)…
23
9.0 Breaker - Attach To /Remove From Carrier
25
9.1 Carrier Requirements…………………………
25
9.2 Mounting Kits…………………………………..
25
9.3 Tools Required to Attach the Breaker……….
25
9.4 Attach Breaker to the Carrier………..………
25
9.5 Supply Hose IN and Return Hose OUT..……
26
9.6 Removal from Carrier………………..…..…...
27
9.6.1 Tools Required For Removal of Breaker.…
27
10.0 Tool Removal and Installation…………….
29
10.1.1 Safety Precautions – Read First………….
29
10.1.2 Tools Needed For Removal…….…………. 29
10.1.3 Overview of Tool Retainer System……….
29
10.1.4 Tool Removal…. ………………………...…
30
10.2 Tool Inspection & Prepare For Installation...
30
10.3.1 Install Tool – General……….……………... 30
SECTION
Pg.
10.3.2 Tools Needed to Install………….………….
31
10.3 3 How to Install Tool………………….……...
31
10.4 Tool Re-lubrication – Conventional Method
31
10.4.1 Avoid Costly Lubrication Mistakes………
32
10.5 Tool Re-lubrication – Automatic Systems…
33
10.5.1 Tool Re-lubrication Carrier Mounted Type
33
10.5.2 Tool Re-lubrication Breaker Mounted Type
33
10.6 Benefits of Using Chisel Paste………..……
33
11.0 Tool Selection Guide……………………….
34
11.1 Match the Application…………….…………
34
11.1.1 Methods Used to Break Up Material………
34
11.2 Tool Working Length……………….…………
34
11.3 Tool Sharpening………………….…………..
34
12.0 Back Head & Accumulator Gas Charge…
35
12.1 Charge Tool - General Description………
35
12.2 Safety precautions for Charging Back Head
36
12.2.1 Tools Required for Charging Back Head
36
12.2.2 Connecting the Charging Block…….….…
36
12.2.3 How to Measure Gas Charge…………..….
36
12.2.4 How to Pre-charge the Back Head.………
37
12.2.5 Removing the Charging Block……………..
37
12.3 Safety precautions Charging Accumulator
37
12.3.1 Tools Required for Charging Accumulator
38
12.3.2 Connecting the Charging Block……….…
38
12.3.3 How to Measure Gas Charge……………..
38
12.3.4 Charging the Accumulator.……………….. 38
12.3.5 Removing the Charging Block…………....
38
13.0 Troubleshooting Guide…………………….
39
14.0 Technical Information………………………
43
14.1 Definition of Terms…………………………..
43
14.2 Testing the Hydraulic Circuit………………..
44
Summary of Contents for Hy-Ram HR270
Page 60: ...SOMM57720214mar R ...