
Allied Construction Products, LLC www.alliedcp.com
SOMM577202_14mar
27
9.0 Attach / Remove Breaker From Carrier –
[cont’d]
2. Connect hoses to the shut-off valves located on
the carrier. (Supply hose tagged "PRESSURE")
Fig. 9-5 Connect Supply & Return Hoses to Carrier
Fig. 9-6 Check hose routing and length
3. Raise the Breaker off the ground. Operate the
bucket cylinder thru its full range of motion to
assure hoses will not be pinched or restricted.
9.6 Removal from Carrier
CAUTION
Burn injury from contact with hot
surface. Some components become hot
during operation. Allow parts and fluids
to cool before handling.
The procedure described is for a typical pin on type.
Procedures can vary between different machines. Be
sure to follow the instructions found in the manual
provided by the carrier manufacturer.
CAUTION
Some procedures, such as attaching
the Breaker to and from the carrier, will
require an assistant. Both the operator
and assistant must be qualified in
these procedures.
Take all necessary precautions. Throughout the
procedure the machine operator shall be seated in
the operator’s seat and maintain full control of the
machine. All directions and signals must be agreed
upon in advance. Take signals from only ONE
person.
Crush hazard. Use sufficient blocking to
avoid accidental or sudden movement of
the Breaker. Keep hands and feet clear of
crush points. Do not touch any moving
parts.
Use personal protective equipment when
handling the breaker. PPE should include
appropriate clothing, gloves, safety
eyewear and shoes.
Fig. 9-7 Close Shut Off Valve to Breaker
IMPORTANT
Contamination can shorten service life. Prevent dirt
and debris from contaminating the oil. Always
clean the area around the connections prior to
removal of plugs or caps. Have a suitable container
and rags on hand before disconnecting hose.
Collect fluid and obey all local regulations for the
disposal of these fluids.
9.6.1 Tools Required For Removal
No special tools are required, but the following tools
should be available:
Summary of Contents for Hy-Ram HR270
Page 60: ...SOMM57720214mar R ...