TORREXX TABLE of CONTENTS - Continued
4. OPERATION
GENERAL
4-20
OPERATING INSTRUCTIONS
4-20
STARTING THE VAPORIZER
4-20
STOPPING THE VAPORIZER
4-21
PURGING THE VAPORIZER
4-21
5. MAINTENANCE
GENERAL
5-22
INITIAL INSTALLATION AND OPERATION INSPECTIONS
5-22
ANNUAL MAINTENANCE REQUIREMENTS
5-23
Liqui-SAFE VALVE – PERFORMANCE CHECK
5-24
Figure 10 – Steps to check Liqui-SAFE valve operation.
5-24
Liqui-SAFE VALVE – SERVICE INSTRUCTIONS
5-25
Figure 11A – STEP 1 – Be sure the Liqui-SAFE valve
is in the closed position as shown.
5-25
Figure 11B – STEP 2 – Unscrew reset button base and remove the spring.
5-25
Figure 11C – STEP 3 – Replace button post internal O-ring.
5-26
Figure 11D – Full hook O-ring tool
5-26
Figure 11E – STEP 4 – Unscrew valve latch body.
5-26
Figure 11F – STEP 5 – Replace valve body static O-ring.
5-27
Figure 11G – STEP 6 – Replace valve seat and valve stem base O-rings.
5-27
6. TROUBLESHOOTING
TROUBLESHOOTING TREES
6-28
FULL LOAD VOLTAGE CHECK
6-34
Figure 12 – Full Load Voltage Check
6-34
FULL LOAD CURRENT CHECK
6-35
Figure 13 – Full Load Current Check
6-35
TORREXX ELECTRIC VAPORIZER DATA SHEET
6-36
HEATER CORE RESISTANCE
6-37
Figure 14 – Heater Core Resistance Check
6-37
SOLENOID VALVE LEAK TEST
6-38
Figure 15 – Solenoid Valve Leak Test Components
6-38
Summary of Contents for TORREXX TX240
Page 52: ...APPENDIX A TECHNICAL INFORMATION ...
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 80: ...ASCO Valve used by Algas SDI ...
Page 82: ......
Page 83: ......
Page 84: ......
Page 85: ......