
Chassis Ground Wiring
88
7750 SR-a4 and SR-a8 Installation Guide
Step 2.
Using a wire-stripping tool, strip the insulation from the wire according to the local
safety code and crimp the ring lug to the wire, as shown in
Step 3.
Place the two-hole lug on the ground studs such that the wire runs down the rack
upright.
Step 4.
Secure the lug with the two supplied KEP nuts. Orient the KEP nuts so that the KEP
washer is in contact with the lug. Tighten the nuts to a torque of 18 to 20 lbf-in
(0.9 to 1.13 N
.
m) maximum. Do not over-tighten.
Step 5.
Form a service loop with the extra wire and secure it to a convenient place (for
example, a rack upright).
Step 6.
Connect the opposite end of the ground wire to the appropriate ground point at the
installation site. Ensure that the chassis ground connection is made according to the
local safety code.
Step 7.
Install an optional cable management system. Otherwise, go to
for information about how to connect the router to the power source.
Summary of Contents for 7750 SR-a4
Page 8: ...Table of Contents 8 7750 SR a4 and SR a8 Installation Guide...
Page 12: ...List of Tables 12 7750 SR a4 and SR a8 Installation Guide...
Page 16: ...List of Figures 16 7750 SR a4 and SR a8 Installation Guide...
Page 22: ...Technical Support 22 7750 SR a4 and SR a8 Installation Guide...
Page 70: ...Safety Standards Compliance Agency Certifications 70 7750 SR a4 and SR a8 Installation Guide...
Page 136: ...Troubleshooting Initial Startup 136 7750 SR a4 and SR a8 Installation Guide...
Page 170: ...44 port 1GigE CSFP SFP MDA a Overview 170 7750 SR a4 and SR a8 Installation Guide...
Page 210: ...Removing and Replacing an Impedance Panel 210 7750 SR a4 and SR a8 Installation Guide...
Page 232: ...2015 Alcatel Lucent All rights reserved 3HE 10231 AAAA TQZZA Edition 01...