
Safety Considerations
62
7750 SR-a4 and SR-a8 Installation Guide
Grounding
The router is suitable for installation as part of the Common Bonding Network (CBN) or an
Isolated Bonding Network (IBN).
The router is suitable for installation in Network Telecommunication Facilities or locations
where the NEC applies.
Danger:
AC powered units
•
Chassis ground cables are not included. Use only power cords that have a grounding
(earthing) path. Main grounding (earthing) connection points are through the IEC60320
appliance inlets. Grounding (earthing) points on the sides of the equipment are for
equipotential bonding only and are safety grounding (earthing) points for the equipment.
Lack of correct grounding (earthing) of the equipment may result in a safety hazard and
excessive electromagnetic emissions.
The ground conductor must be #8 AWG minimum or the same AWG as the power
conductors if they are larger.
•
The router and equipment rack must be correctly grounded. If you ground the
equipment by a method other than those provided in this manual, that method should
be in compliance with all local wiring regulations and practices.
Warning:
•
Electrostatic discharge (ESD) damage can occur if components are mishandled.
Always wear an ESD-preventive wrist or ankle strap in contact with bare skin. Always
connect the ESD strap (with banana plug) to the ESD connection socket (grounding
jack) on the front of the chassis. An ESD strap is included in the accessory box that is
shipped with the chassis.
Danger:
DC powered units
•
The 7750 SR-a includes a terminal for chassis ground on the front of the chassis. For
both AC- and DC-powered deployments, the ground terminal must be connected.
Ensure that all power is OFF from the DC circuit. Locate the circuit breaker on the panel
board that serves the DC circuit. Switch the circuit breaker to the OFF position. For extra
safety, you can tape the handle of the circuit breaker to the OFF position.
•
When wiring the unit, the ground connection must always be made first and
disconnected last.
•
The correct wiring sequence is -V BAT/negative to -V BAT/negative and 0V
RTN/positive to 0V RTN/positive.
Summary of Contents for 7750 SR-a4
Page 8: ...Table of Contents 8 7750 SR a4 and SR a8 Installation Guide...
Page 12: ...List of Tables 12 7750 SR a4 and SR a8 Installation Guide...
Page 16: ...List of Figures 16 7750 SR a4 and SR a8 Installation Guide...
Page 22: ...Technical Support 22 7750 SR a4 and SR a8 Installation Guide...
Page 70: ...Safety Standards Compliance Agency Certifications 70 7750 SR a4 and SR a8 Installation Guide...
Page 136: ...Troubleshooting Initial Startup 136 7750 SR a4 and SR a8 Installation Guide...
Page 170: ...44 port 1GigE CSFP SFP MDA a Overview 170 7750 SR a4 and SR a8 Installation Guide...
Page 210: ...Removing and Replacing an Impedance Panel 210 7750 SR a4 and SR a8 Installation Guide...
Page 232: ...2015 Alcatel Lucent All rights reserved 3HE 10231 AAAA TQZZA Edition 01...