
102
Chapter 10: Project management
■
Reloading from a DAT
1. Press the
RELOAD
[F3] key in Project mode.
The DATA RELOAD window appears.
2. Select
DAT
in the
Device
field.
3. Press the
DO IT
[F5] key.
The DPS12 waits for the data to be loaded.
4. Play the DAT tape that contains the backup data.
When the reload operation is complete, the display returns to the PROJECT screen.
CAUTION :
Do not monitor the audio via the DAT during the backup operation. Since audio and other
data is transmitted as a digital signal, an attempt to monitor it may damage the speakers.
✐
TIP :
Press the
CANCEL
[F2]
key to cancel the reload operation.
Summary of Contents for DPS12
Page 12: ......