Engineering manual
80
C.
Duct installation
1. Side openings are provided for installing separate ducts for outside air intake and treated air distribution to an adjacent
room.
2. Use a punch to remove the knock-down openings on the casing. Use a knife to make the suitable opening on the
polystyrene behind the casing.
TAKE CARE not to damage the heat exchanger coil located behind the openings.
3. Plug the gaps between the ducts and the opening edge with anti-condensation insulation.
4. Use material which can withstand a continuous operating temperature of 60. The ducts can be of the flexible type
with a spring core or of corrugated aluminium, covered inside with an insulating material (12 to 25 mm thick glass
fiber).
5. When the installation is finished, all the surfaces of the non-insulated ducts must be covered with anti-condensation
insulation material (6mm thick expanded polystyrene or expanded neoprene). Fire proofing classification: M1.
6. Distributing air to an adjacent room requires the corresponding panel air outlets to be sealed by using the sealing
material (Accessory)
7. A decoration grille must be fitted in the partition between the air conditioned room (where the cassette is installed)
and the adjacent room.
Chart 1-13
Chart 1-14
Summary of Contents for KXV Series
Page 36: ...Engineering manual 36 Heating Chart 1 1 b...
Page 69: ...Engineering manual 69 1 3 2 Exploded view Unit body exploded view Chart 1 7...
Page 70: ...Engineering manual 70 Panel exploded view Chart 1 8...
Page 75: ...Engineering manual 75 1 4 Electric board wiring diagram Chart 1 9...
Page 93: ...Engineering manual 93 2 3 2 Exploded view Unit body exploded view Chart 2 5...
Page 94: ...Engineering manual 94 Panel exploded view Chart 2 6...
Page 99: ...Engineering manual 99 2 4 Electric board wiring diagram Chart 2 7...
Page 118: ...Engineering manual 118 3 3 2 Exploded view Chart 3 6...
Page 124: ...Engineering manual 124 3 4 Electric board wiring diagram Chart 3 7...
Page 143: ...Engineering manual 143 4 3 2 Exploded view DLV007 009 012 015 exploded view Chart 4 4...
Page 144: ...Engineering manual 144 DLV018 021 024 exploded view Chart 4 5...
Page 150: ...Engineering manual 150 4 4 Electric board wiring diagram Chart 4 6...
Page 166: ...Engineering manual 166 5 3 2 Exploded view Chart 5 4...
Page 167: ...Engineering manual 167 5 4 Electric board wiring diagram Chart 5 5...
Page 182: ...Engineering manual 182 6 3 2 Exploded view PNV007 009 012 exploded view Chart 6 5...
Page 183: ...Engineering manual 183 PNV015 018 021 exploded view Chart 6 6...
Page 189: ...Engineering manual 189 6 4 Electric board wiring diagram Chart 6 7...
Page 204: ...Engineering manual 204 1 Outdoor unit Model KBTU h Brand YAV112 38 2 YAV140 47 8 Airwell...
Page 207: ...Engineering manual 207 1 2 2 Exploded view YAV112 140 Chart 1 2...
Page 210: ...Engineering manual 210 1 3 Electric board wiring diagram Chart 1 3...
Page 212: ...Engineering manual 212 Chart 1 10 Chart 1 11 Chart 1 12 Chart 1 13 Chart 1 14 Unit mm...
Page 283: ...Engineering manual 283 Chart 3 4...
Page 294: ...Engineering manual 294 4 1 Appearance RC3i 1 A Q C E F G I D H J K L M N O P B...
Page 295: ...Engineering manual 295 A B C G D F E H I J K L M N O P Q RC7i 1...
Page 372: ...Engineering manual 372...
Page 376: ...Engineering manual 376 Click the value area of axis a dialog is shown to set the range of axis...