Engineering manual
170
5.6.3 Unit installation
A.
Unit installation
Insert 4 M10 or 3/8
”
threads rods into the ceiling.
Introduce the rods through the slots of unit suspension brackets.
Position the shock absorbers, add washers and screw the nuts until the unit is firmly supported.
In case of a gap between the unit and the ceiling, put a rubber or a neoprene sheet.
Important: The unit must be perfectly levelled.
B.
Holes Drilling location on the ceiling for indoor unit
Model A
B
DSV018~DSV024 797 599
DSV030~DSV036 861 663
C.
Draining installation
For an efficient functioning of the drainage system please take care of the following:
Since the drainage basin bottom is sloppy, Alleyways balance the unit by the suspension brackets and not by the
drainage basin itself.
Always lay the drain with downward inclination 2%. Prevent any upward flow or reverse flow in any part.
Use 19 mm tube for drainage.
Chart 5-7
Chart 5-8
Summary of Contents for KXV Series
Page 36: ...Engineering manual 36 Heating Chart 1 1 b...
Page 69: ...Engineering manual 69 1 3 2 Exploded view Unit body exploded view Chart 1 7...
Page 70: ...Engineering manual 70 Panel exploded view Chart 1 8...
Page 75: ...Engineering manual 75 1 4 Electric board wiring diagram Chart 1 9...
Page 93: ...Engineering manual 93 2 3 2 Exploded view Unit body exploded view Chart 2 5...
Page 94: ...Engineering manual 94 Panel exploded view Chart 2 6...
Page 99: ...Engineering manual 99 2 4 Electric board wiring diagram Chart 2 7...
Page 118: ...Engineering manual 118 3 3 2 Exploded view Chart 3 6...
Page 124: ...Engineering manual 124 3 4 Electric board wiring diagram Chart 3 7...
Page 143: ...Engineering manual 143 4 3 2 Exploded view DLV007 009 012 015 exploded view Chart 4 4...
Page 144: ...Engineering manual 144 DLV018 021 024 exploded view Chart 4 5...
Page 150: ...Engineering manual 150 4 4 Electric board wiring diagram Chart 4 6...
Page 166: ...Engineering manual 166 5 3 2 Exploded view Chart 5 4...
Page 167: ...Engineering manual 167 5 4 Electric board wiring diagram Chart 5 5...
Page 182: ...Engineering manual 182 6 3 2 Exploded view PNV007 009 012 exploded view Chart 6 5...
Page 183: ...Engineering manual 183 PNV015 018 021 exploded view Chart 6 6...
Page 189: ...Engineering manual 189 6 4 Electric board wiring diagram Chart 6 7...
Page 204: ...Engineering manual 204 1 Outdoor unit Model KBTU h Brand YAV112 38 2 YAV140 47 8 Airwell...
Page 207: ...Engineering manual 207 1 2 2 Exploded view YAV112 140 Chart 1 2...
Page 210: ...Engineering manual 210 1 3 Electric board wiring diagram Chart 1 3...
Page 212: ...Engineering manual 212 Chart 1 10 Chart 1 11 Chart 1 12 Chart 1 13 Chart 1 14 Unit mm...
Page 283: ...Engineering manual 283 Chart 3 4...
Page 294: ...Engineering manual 294 4 1 Appearance RC3i 1 A Q C E F G I D H J K L M N O P B...
Page 295: ...Engineering manual 295 A B C G D F E H I J K L M N O P Q RC7i 1...
Page 372: ...Engineering manual 372...
Page 376: ...Engineering manual 376 Click the value area of axis a dialog is shown to set the range of axis...