
PCBRM15 & PCBRM System 5.2 User’s Manual Chapter 3: Set Up & Installation
Part No. 4005.00.906
3-5
3. Place the board to be used in the process in to the
carrier arms. Align the site to be processed on the
board over the flow well and lock in place.
4. The board now will need to be leveled to match the
flow well. (step 2)
NOTE:
The adjustment will be in the Y-axis only
not the X-axis
5. To adjust the board to match the flow well, loosen
the two front screws only on each arm two turns.
Summary of Contents for PCBRM15
Page 1: ...PCBRM15 PCBRM System 5 2 ...
Page 2: ......
Page 4: ......
Page 6: ...PCBRM15 PCBRM System 5 2 User s Manual Table of Contents 4005 00 906 ...
Page 28: ...PCBRM15 PCBRM System 5 2 User s Manual Chapter 3 Set Up Installation Part No 4005 00 906 3 2 ...
Page 42: ...PCBRM15 PCBRM System 5 2 User s Manual Chapter 3 Set Up Installation Part No 4005 00 906 3 16 ...
Page 70: ...Pcbrm15 PCBRM System 5 2 User s Manual Chapter 5 Maintenance Parts Part No 4005 00 906 5 2 ...
Page 88: ...Pcbrm15 PCBRM System 5 2 User s Manual Chapter 6 Troubleshooting Part No 4005 00 906 6 2 ...
Page 92: ...Pcbrm15 PCBRM System 5 2 User s Manual Chapter 6 Troubleshooting Part No 4005 00 906 6 6 ...
Page 94: ...Pcbrm15 PCBRM System 5 2 User s Manual Chapter 7 Schematics Part No 4005 00 906 7 2 ...
Page 96: ......
Page 98: ......
Page 100: ......
Page 101: ......
Page 102: ......
Page 104: ......
Page 106: ......
Page 108: ......
Page 110: ......
Page 111: ......
Page 112: ......
Page 113: ......
Page 114: ......
Page 115: ......
Page 116: ......
Page 117: ......
Page 118: ......
Page 119: ......
Page 120: ......