GASGUARD
®
TE10 Distribution System Manual
Air Products and Chemicals, Inc.
10 - 4
Item Task Frequency
Observe the Distribution
System for any signs of
corrosion or leakage.
Daily
Cleaning of enclosures and
open racks. Does not
include electronic
controller enclosure
interior.
Sweep enclosures and
racks. Clean all external
surfaces with a clean damp
cloth.
Every three months
Do not use pressurized water to
clean inside or outside of cabinets
as serious damage could occur to
the electronic components.
Pressure transducers and
gauges
Check process and purge
pressures for readings that
are outside of the
specification range (found
in Section 11 of this
manual) or vary abnormally
from previous values.
Daily
Check
calibration.
Yearly
All valves and regulators
Examine each valve and
regulator for external leaks.
Replace as required.
Every six months
1/4 turn diaphragm valves
Observe 1/4 turn
diaphragm valves in closed
position. If the needle is
not in the green zone,
follow manufacturer's
adjustment or repair
procedure.
Every six months for
corrosive gases.
Yearly for noncorrosive
gases.
Summary of Contents for GASGUARD TE10
Page 2: ......
Page 12: ...GASGUARD TE10 Distribution System Manual Air Products and Chemicals Inc Page i x...
Page 70: ...GASGUARD TE10 Distribution System Manual Air Products and Chemicals Inc Page 3 4...
Page 92: ...GASGUARD TE10 Distribution System Manual Air Products and Chemicals Inc Page 4 12...
Page 94: ......
Page 154: ......
Page 166: ......
Page 174: ......
Page 180: ......
Page 188: ......
Page 190: ...GASGUARD TE10 Distribution System Manual Air Products and Chemicals Inc Page B 2...
Page 191: ...Appendix B Revision November 2004 Page B 3...
Page 192: ...GASGUARD TE10 Distribution System Manual Air Products and Chemicals Inc Page B 4...
Page 193: ...Appendix B Revision November 2004 Page B 5...
Page 194: ...GASGUARD TE10 Distribution System Manual Air Products and Chemicals Inc Page B 6...