Section 6: Distribution System Functional Checklist
Revision – November 2004
Page 6 - 5
AIR PRODUCTS APx DISTRIBUTION SYSTEM FIELD START-UP CHECKLIST
page 2 of 8
ELECTRICAL
Check off line item when completed
Sign and date when section is completed
Branch 1-4 (A-D)
Branch 5-8 (E-H)
Earth ground installed
120v/240v electrical complete (circle)
Graphics panel condition satisfactory
Elect. sealoffs poured
I/O wired per DWG # EE-_______ series
Verify heat tape power
SECTION COMPLETED SIGNATURE___________________ DATE ________
CONTROLLER
Branch 1-4 (A-D)
Branch 5-8 (E-H)
Seat all circuit boards, eproms and ribbon cable
connections ( caution: remove power before
removing eproms or circuit boards)
E-stop guard in place
Remove pneumatic bulkheads from the back of the controller.
Do all valves operate ?
Manual mode operation
No audible solenoid leaks
Re-install pneumatic bulkheads from the back of the controller.
Firmware versions:
PLC
HMI
Network
Configuration File Rev.
External Shutdown wired
Supervisory circuit utilized
Correct program loaded / version
Program name and date
Life safety system utilized ( yes / no )
Life safety system contact N.O. ( yes / no )
Barriers installed per controller item # verification
SEMC See attached GASGUARD inspection and test
sheet
Shorting blocks per controller item # verification
SEMC See attached GASGUARD inspection and test
sheet
Verify device addressing indicated on the controller
Distribution System Name
Profibus Address
IP Address
IP Subnet Mask (Ethernet Only)
Default Gateway (Ethernet Only)
Distribution system communicating with network
Controller door adjustment
Z - purge set @
≥
0.1" H2O
SECTION COMPLETED SIGNATURE_________________ DATE ________
Summary of Contents for GASGUARD TE10
Page 2: ......
Page 12: ...GASGUARD TE10 Distribution System Manual Air Products and Chemicals Inc Page i x...
Page 70: ...GASGUARD TE10 Distribution System Manual Air Products and Chemicals Inc Page 3 4...
Page 92: ...GASGUARD TE10 Distribution System Manual Air Products and Chemicals Inc Page 4 12...
Page 94: ......
Page 154: ......
Page 166: ......
Page 174: ......
Page 180: ......
Page 188: ......
Page 190: ...GASGUARD TE10 Distribution System Manual Air Products and Chemicals Inc Page B 2...
Page 191: ...Appendix B Revision November 2004 Page B 3...
Page 192: ...GASGUARD TE10 Distribution System Manual Air Products and Chemicals Inc Page B 4...
Page 193: ...Appendix B Revision November 2004 Page B 5...
Page 194: ...GASGUARD TE10 Distribution System Manual Air Products and Chemicals Inc Page B 6...