Wireless Remote Base Unit for VS Series and G8610, G8611, or G8612 Series Leak Detectors
Page
13
of 14
Document No.
699910002
Revision
D
10) Unfurl the black/red wire (P1-RF) with the 24 V three-pin connector and the ground lug (Figure 7: 24 V Power
Cable), which is tie rapped at the base of the leak detector, and:
•
Plug the 24 V connector labeled P1-RF into the three-pin connector on the wireless board.
•
Attach the 24 V ground lug to one of the bracket screws.
Figure 7: 24 V Power Cable
11) Reinstall the valve and dress internal wires inside of leak detector (Figure 2: Removing Valve).
12) Reattach front and side (Figure 1: Covers).
13) Rotate the antenna to its horizontal locked position.
14) Guide the antenna through its location hole in the rear cover. Then secure the rear cover to the frame using
existing hardware.
Base PCB 24 V
Power Cable
Ground Screw
Power In