INITIAL START-UP
4-2
Figure 4.1
1/4” Gas Plug Location
(See Appendix F for IRI Gas Trains)
4.2.3 PREPARING THE FLUE VENT
PROBE HOLE
1. If the unit has been installed using the
recommended AL29-4C vent, there will be a
3/8” hole, in the center of the starter section
(Part #123679). The outer vent section, that
covers the vent section connections must be
loosened and moved to uncover the hole
(see Figure 4.2)
2. Adjust the stop on the combustion analyzer
probe, if so equipped, so that it extends
approximately midway into the flue gas flow.
Do not insert the probe at this time.
Figure 4.2
Analyzer Probe Hole Location
4.2.4 INSTALLING THE DIFFERENTIAL
REGULATOR ADJUSTMENT TOOL FOR
NATURAL GAS UNIT.
1. Remove the cap from the differential
pressure regulator (see Figure 4.3).
2. Place the gasket from the regulator cap onto
the regulator adjustment tool.
3. Prior to installing the tool on the regulator,
pull up the screwdriver blade of the tool.
Then thread the tool into the regulator and
hand tighten.
4. Engage the tool’s screwdriver blade into the
regulator’s adjustment screw slot.
Figure 4.3
Differential Regulator Adjustment Tool
Installation For Natural Gas Unit
NOTE:
Gas train drawings for Dual-Fuel units are
included in Appendix F.
4.2.5 INSTALLING THE DIFFERENTIAL
REGULATOR ADJUSTMENT TOOLS FOR
DUAL FUEL UNIT
1. Remove the cap from each differential
pressure regulator (see Figure 4.4).
2. Place the gaskets from the regulator caps
onto the regulator adjustment tools
.
3. Prior to installing the tools on the regulators,
pull up the screwdriver blade of each tool to
the stop. Next, thread the tool into each
regulator and hand tighten.
Summary of Contents for GF-110 Benchmark Series
Page 6: ......
Page 8: ......
Page 12: ......
Page 32: ......
Page 40: ......
Page 46: ......
Page 52: ......
Page 58: ......
Page 68: ......
Page 76: ......
Page 77: ...APPENDIX C C 1 Temperature Sensor Resistance Chart Balco ...
Page 78: ......
Page 84: ......
Page 85: ......
Page 86: ......
Page 87: ......
Page 88: ...APPENDIX F F 4 ...
Page 89: ...APPENDIX F F 5 ...
Page 90: ......
Page 91: ......
Page 92: ......
Page 93: ...APPENDIX F F 9 ...
Page 94: ...APPENDIX F F 10 ...
Page 95: ......
Page 96: ......
Page 97: ......
Page 98: ......
Page 99: ...APPENDIX G G 5 ...
Page 100: ......
Page 101: ...APPENDIX H H 1 ...
Page 102: ...APPENDIX H H 2 ...
Page 104: ...APPENDIX H H 4 ...
Page 105: ...APPENDIX H H 5 ...
Page 106: ...APPENDIX H H 6 ...
Page 108: ......
Page 110: ...APPENDIX J J 2 P1 P2 P3 P4 P5 P6 BENCHMARK CONTROL PANEL REAR VIEW ...
Page 112: ...APPENDIX K K 2 FIGURE 1 DUAL FUEL DIVERTER VALVE FIGURE 2 DUAL FUEL AIR INJECTION VALVE ...
Page 115: ......
Page 116: ......