INSTALLATION
2-6
GND
NEU
L2
L1
220 VAC, 1 PHASE
220 VAC, 1 Phase
GND
NEU
L2
L3
L1
208 VAC, 3 PHASE
208 VAC, 3 Phase
GND
L2
L3
L1
460 VAC, 3 PHASE
460 VAC, 3 Phase
Figure 2.7
AC Terminal Block Configurations
2.6 MODE OF OPERATION and FIELD
CONTROL WIRING
The Benchmark Boiler is available in several
different modes of operation. While each unit is
factory configured and wired for a particular
mode, some field wiring may be required to
complete the installation. This wiring is typically
run to the Input/Output (I/O) Box located on the
front of the unit behind the removable front door
(see Fig. 2.8). A brief description of each mode
of operation, and their requirements, is de-
scribed in the following paragraphs. Additional
information concerning field wiring is provided in
paragraphs 2.7.1 through 2.7.9. For additional
information on modes of operation, refer to
Chapter 5.
Figure 2.8
I/O Box Terminal Location
2.6.1 CONSTANT SETPOINT MODE
The Constant Setpoint Mode is used when it is
desired to have a fixed setpoint that does not
deviate. No wiring connections other than
electrical supply connections are required for
this mode. However, if desired, fault monitoring
or enable/disable interlock wiring can be utilized
(see paragraphs 2.7.9.1 and 2.7.10).
2.6.2 INDOOR/OUTDOOR RESET MODE
This mode of operation increases supply water
temperature as outdoor temperatures decrease.
An outside air temperature sensor (AERCO PN
GM-122791) is required. The sensor MUST BE
wired to the I/O Box wiring terminals (see Fig.
2.9). For more information concerning the
outside air sensor installation, refer to paragraph
2.7.1
Summary of Contents for GF-110 Benchmark Series
Page 6: ......
Page 8: ......
Page 12: ......
Page 32: ......
Page 40: ......
Page 46: ......
Page 52: ......
Page 58: ......
Page 68: ......
Page 76: ......
Page 77: ...APPENDIX C C 1 Temperature Sensor Resistance Chart Balco ...
Page 78: ......
Page 84: ......
Page 85: ......
Page 86: ......
Page 87: ......
Page 88: ...APPENDIX F F 4 ...
Page 89: ...APPENDIX F F 5 ...
Page 90: ......
Page 91: ......
Page 92: ......
Page 93: ...APPENDIX F F 9 ...
Page 94: ...APPENDIX F F 10 ...
Page 95: ......
Page 96: ......
Page 97: ......
Page 98: ......
Page 99: ...APPENDIX G G 5 ...
Page 100: ......
Page 101: ...APPENDIX H H 1 ...
Page 102: ...APPENDIX H H 2 ...
Page 104: ...APPENDIX H H 4 ...
Page 105: ...APPENDIX H H 5 ...
Page 106: ...APPENDIX H H 6 ...
Page 108: ......
Page 110: ...APPENDIX J J 2 P1 P2 P3 P4 P5 P6 BENCHMARK CONTROL PANEL REAR VIEW ...
Page 112: ...APPENDIX K K 2 FIGURE 1 DUAL FUEL DIVERTER VALVE FIGURE 2 DUAL FUEL AIR INJECTION VALVE ...
Page 115: ......
Page 116: ......