MAINTENANCE
bushing over the contactor and reconnect
the igniter cable.
8. Reinstall the side and top panels on the unit.
Table 7-1 - Maintenance Schedule
PARAGRAPH
ITEM
6 Mos.
12 Mos.
24 Mos.
Labor
Time
7.2
Spark Igniter
(GP-122435-S)
*Inspect Replace
15
mins.
7.3
Flame Detector
(123970)
*Inspect Replace
15
mins.
7.4
Combustion
Adj.
*Check Check
1
hr.
7.5
Testing of
Safety Devices
See CSD-1
Chart in
Appendix
20
mins.
7.6 Burner
Inspect
2
hrs.
7.7
Condensate
Drain Trap
Inspect
Inspect &
Clean
Inspect &
clean if
necessary
1 hr.
* Only performed after initial 6 month period after initial startup.
7.3 FLAME DETECTOR
The flame detector (part no. 123970) is located
in the body of the burner (see Fig. 7.1). The
flame detector may be HOT. Allow the unit to
cool sufficiently before removing the flame
detector.
To inspect or replace the flame detector:
1. Set
the
ON/OFF
switch on the control panel,
to the
OFF
position. Disconnect AC power
from the unit.
2. Remove the side and top panels from the
unit.
3. Disconnect the flame detector lead wire.
Unscrew the flame detector and remove it.
(See Fig 7.2)
4. Inspect the detector thoroughly. If eroded,
the detector should be replaced. Otherwise
clean the detector with a fine emery cloth.
5. Reinstall the flame detector hand tight only.
6. Reconnect the flame detector lead wire.
7. Reinstall the side and top panels on the unit.
7.4 COMBUSTION CALIBRATION
Combustion settings must be checked at the
intervals shown in Table 7-1 as part of the
maintenance requirements. Refer to Chapter 4
for combustion calibration instructions.
Figure 7.2
Spark Igniter and Flame Detector Location
Cut-Away View
7-2
Summary of Contents for GF-110 Benchmark Series
Page 6: ......
Page 8: ......
Page 12: ......
Page 32: ......
Page 40: ......
Page 46: ......
Page 52: ......
Page 58: ......
Page 68: ......
Page 76: ......
Page 77: ...APPENDIX C C 1 Temperature Sensor Resistance Chart Balco ...
Page 78: ......
Page 84: ......
Page 85: ......
Page 86: ......
Page 87: ......
Page 88: ...APPENDIX F F 4 ...
Page 89: ...APPENDIX F F 5 ...
Page 90: ......
Page 91: ......
Page 92: ......
Page 93: ...APPENDIX F F 9 ...
Page 94: ...APPENDIX F F 10 ...
Page 95: ......
Page 96: ......
Page 97: ......
Page 98: ......
Page 99: ...APPENDIX G G 5 ...
Page 100: ......
Page 101: ...APPENDIX H H 1 ...
Page 102: ...APPENDIX H H 2 ...
Page 104: ...APPENDIX H H 4 ...
Page 105: ...APPENDIX H H 5 ...
Page 106: ...APPENDIX H H 6 ...
Page 108: ......
Page 110: ...APPENDIX J J 2 P1 P2 P3 P4 P5 P6 BENCHMARK CONTROL PANEL REAR VIEW ...
Page 112: ...APPENDIX K K 2 FIGURE 1 DUAL FUEL DIVERTER VALVE FIGURE 2 DUAL FUEL AIR INJECTION VALVE ...
Page 115: ......
Page 116: ......