CONTENTS
iii
APPENDICES
App Subject Page
A
Boiler Menu Item Descriptions
A-1
B
Startup, Status and Fault
Messages
B-1
C
Temperature Sensor Resistance
Chart
C-1
D
Indoor/Outdoor Reset Ratio
Charts
D-1
E Boiler
Default
Settings
E-1
App Subject Page
F
Dimensional and Part Drawings
F-1
G Piping
Drawings
G-1
H Wiring
Schematics
H-1
I
Recommended Periodic Testing
Checklist
I-1
J
Benchmark Control Panel Views
J-1
K Benchmark
Dual-Fuel
Propane
Switch-Over Instructions
K-1
WARRANTIES
W-1
Summary of Contents for GF-110 Benchmark Series
Page 6: ......
Page 8: ......
Page 12: ......
Page 32: ......
Page 40: ......
Page 46: ......
Page 52: ......
Page 58: ......
Page 68: ......
Page 76: ......
Page 77: ...APPENDIX C C 1 Temperature Sensor Resistance Chart Balco ...
Page 78: ......
Page 84: ......
Page 85: ......
Page 86: ......
Page 87: ......
Page 88: ...APPENDIX F F 4 ...
Page 89: ...APPENDIX F F 5 ...
Page 90: ......
Page 91: ......
Page 92: ......
Page 93: ...APPENDIX F F 9 ...
Page 94: ...APPENDIX F F 10 ...
Page 95: ......
Page 96: ......
Page 97: ......
Page 98: ......
Page 99: ...APPENDIX G G 5 ...
Page 100: ......
Page 101: ...APPENDIX H H 1 ...
Page 102: ...APPENDIX H H 2 ...
Page 104: ...APPENDIX H H 4 ...
Page 105: ...APPENDIX H H 5 ...
Page 106: ...APPENDIX H H 6 ...
Page 108: ......
Page 110: ...APPENDIX J J 2 P1 P2 P3 P4 P5 P6 BENCHMARK CONTROL PANEL REAR VIEW ...
Page 112: ...APPENDIX K K 2 FIGURE 1 DUAL FUEL DIVERTER VALVE FIGURE 2 DUAL FUEL AIR INJECTION VALVE ...
Page 115: ......
Page 116: ......