4. Connect the remaining grid-side conductors to the
L1
,
L2
,
L3,
and
N
locations
on the AC terminal block
5. Tighten each AC input terminal and torque each terminal clockwise to a value
between 1.2 Nm (10.6 lb-in) and 1.5 Nm (13.0 lb-in).
6. Turn on the utility circuit breaker.
7. Using a multimeter, confirm the AC voltage measurement coming from the
utility. The utility line is routed to the feedthrough installed on the bottom of
the inverter.
The maximum is 304.7 V (phase to neutral conductor). If the AC voltage is
higher, contact your local utility company.
8. Confirm that the feed-in AC utility voltage meets the requirements of the
power system using a multimeter by measuring the AC voltage between line
and ground.
9. Turn off the utility grid circuit breaker.
10. Complete a final check of the connections to ensure they are snug and
protected from rain.
11. Close the connection box cover.
Advanced Energy® AE 3TL Inverters
570-1003552-05A
Installing
4‑27
Summary of Contents for AE 3TL 1000 Series
Page 2: ......
Page 12: ...Advanced Energy xii 570 1003552 05A List of Tables...
Page 14: ...Advanced Energy xiv 570 1003552 05A List of Figures...
Page 26: ...Advanced Energy 1 12 Safety and Product Compliance Guidelines 570 1003552 05A...
Page 64: ...Advanced Energy 4 28 Installing 570 1003552 05A...
Page 86: ...Advanced Energy 6 4 Operating the Arc Fault Detection Unit 570 1003552 05A...
Page 92: ...Advanced Energy 7 6 Data Monitoring and Controls 570 1003552 05A...
Page 110: ...Advanced Energy 9 14 Troubleshooting and Solar Energy Technical Support 570 1003552 05A...
Page 116: ...Advanced Energy A 6 Specifications 570 1003552 05A...
Page 120: ...Advanced Energy B 4 System and Mechanical Diagrams 570 1003552 05A...