Upper handle
Central handle
Lower handle
Central handle
Figure 4‑1. Handle locations
2. Carefully open the box.
3. Use the central handles on each side of the inverter to lift the inverter from the
box.
The cardboard flap remains attached to the inverter housing and can be used to
protect the unit when it is placed on the floor to prevent damage to the lid.
Save the shipping container in case in the future the inverter needs to be moved
in to a new location or returned for service.
Package Contents
The following items are included with the inverter when it is packaged for shipping:
• Wall mount bracket with Phillips screws and M8 washers to secure the bracket
to the wall
• Connector parts:
◦ Two 4-pin RS-485 connectors
◦ One 5-pin connector for irradiation sensor
Advanced Energy® AE 3TL Inverters
570-1003552-05A
Installing
4‑3
Summary of Contents for AE 3TL 1000 Series
Page 2: ......
Page 12: ...Advanced Energy xii 570 1003552 05A List of Tables...
Page 14: ...Advanced Energy xiv 570 1003552 05A List of Figures...
Page 26: ...Advanced Energy 1 12 Safety and Product Compliance Guidelines 570 1003552 05A...
Page 64: ...Advanced Energy 4 28 Installing 570 1003552 05A...
Page 86: ...Advanced Energy 6 4 Operating the Arc Fault Detection Unit 570 1003552 05A...
Page 92: ...Advanced Energy 7 6 Data Monitoring and Controls 570 1003552 05A...
Page 110: ...Advanced Energy 9 14 Troubleshooting and Solar Energy Technical Support 570 1003552 05A...
Page 116: ...Advanced Energy A 6 Specifications 570 1003552 05A...
Page 120: ...Advanced Energy B 4 System and Mechanical Diagrams 570 1003552 05A...