TO INSTALL A FEEDTHROUGH
1. Insert the appropriately sized liquid-tight NEMA 3R conduit hub in the
feedthrough opening.
To assure NEMA 3R protection, use conduit hubs with a rubber seal.
CONNECTING THE GROUNDING STUD
The inverter connection box contains a grounding stud for landing the EGC coming
from the PV module frames. The grounding stud is in the same location in both the
600 and 1000 series inverters.
WARNING:
Before making any other connection, you must connect the secondary
Protective Earth (ground) stud to the system ground terminal. This
connection is a mandatory connection.
AVERTISSEMENT:
Avant d’effectuer tout autre branchement, vous devez connecter la borne de
mise à la terre de protection secondaire à la borne de terre du système. Ce
branchement est obligatoire.
Tools Required
• Insulated gloves
To Connect the Grounding Stud
1. Connect the separate EGC from the grounding stud to an earth ground.
Grounding stud
Figure 4‑5. Grounding stud in the connection box
Advanced Energy® AE 3TL Inverters
570-1003552-05A
Installing
4‑11
Summary of Contents for AE 3TL 1000 Series
Page 2: ......
Page 12: ...Advanced Energy xii 570 1003552 05A List of Tables...
Page 14: ...Advanced Energy xiv 570 1003552 05A List of Figures...
Page 26: ...Advanced Energy 1 12 Safety and Product Compliance Guidelines 570 1003552 05A...
Page 64: ...Advanced Energy 4 28 Installing 570 1003552 05A...
Page 86: ...Advanced Energy 6 4 Operating the Arc Fault Detection Unit 570 1003552 05A...
Page 92: ...Advanced Energy 7 6 Data Monitoring and Controls 570 1003552 05A...
Page 110: ...Advanced Energy 9 14 Troubleshooting and Solar Energy Technical Support 570 1003552 05A...
Page 116: ...Advanced Energy A 6 Specifications 570 1003552 05A...
Page 120: ...Advanced Energy B 4 System and Mechanical Diagrams 570 1003552 05A...