Table 8‑1. Maintenance checklist
Item #
Check or Procedure
Maintenance
Cycle
General inspection and cleaning
1
Record general site conditions.
Annually
2
Record inverter performance data from inverter display.
Annually
3
Record environmental conditions.
Annually
4
Remove dirt and debris from underneath the inverter.
Annually
5
Inspect and touch up damage to exterior paint.
Annually
6
Inspect and clean interior of the connection box.
Annually
7
Clean heatsink.
Annually
8
Inspect and replace seals if necessary.
Annually
9
Confirm presence of product documentation.
Annually
Connections and wiring
10
Complete visual inspection of electrical connections and wiring.
Annually
11
Complete mechanical inspection of connections and wiring.
Annually
12
Measure torque of all electrical connections and retorque as
needed.
Annually
13
Complete thermal scan of inverter connections, wiring and
electronics in the connection box.
Annually
Repair
14
Replace connection box seal if lid is not sealing adequately.
As needed
TO CLEAN THE DISPLAY AND LEDS
Use a clean, damp cloth to remove dust and dirt from the digital display and the
LEDs.
REPLACING THE FUSES
Tools Required
• 15 A fuses
Advanced Energy® AE 3TL Inverters
570-1003552-05A
Maintenance
8‑3
Summary of Contents for AE 3TL 1000 Series
Page 2: ......
Page 12: ...Advanced Energy xii 570 1003552 05A List of Tables...
Page 14: ...Advanced Energy xiv 570 1003552 05A List of Figures...
Page 26: ...Advanced Energy 1 12 Safety and Product Compliance Guidelines 570 1003552 05A...
Page 64: ...Advanced Energy 4 28 Installing 570 1003552 05A...
Page 86: ...Advanced Energy 6 4 Operating the Arc Fault Detection Unit 570 1003552 05A...
Page 92: ...Advanced Energy 7 6 Data Monitoring and Controls 570 1003552 05A...
Page 110: ...Advanced Energy 9 14 Troubleshooting and Solar Energy Technical Support 570 1003552 05A...
Page 116: ...Advanced Energy A 6 Specifications 570 1003552 05A...
Page 120: ...Advanced Energy B 4 System and Mechanical Diagrams 570 1003552 05A...