6TADLP741-1E
TOTAL ACCESS 3000/3010
DLP-741
Page 8 of 8
© 2003, ADTRAN, Inc.
Total Access
®
3000/3010 System Manual
Perform Steps Below in the Order Listed
1.7
Preparing to Provision the Protect MUX (slot B)
Ensure that Linked Provisioning is “Enabled” on the Primary MUX before proceeding.
The factory default setting for Linked-Provisioning is “Enabled”’ and should be
already set. The procedure to access this feature is listed below for convenience.
1. From the Total Access Main menu, select option 2,
Common A
, and press <Enter>.
This will be the menu for the STS-1 MUX in slot A.
2. From the STS-1 MUX A Menu, select option 2,
Provisioning
, and press <Enter>.
Check to see if Enabled or Disabled. To enable, continue with the next two steps.
3. From the Provisioning Menu, select option 5,
Linked Provisioning
, and press
<Enter>.
4. From the Linked Provisioning menu, select option 2,
Enable
, and press <Enter>.
5. Return to the Total Access Main Menu by pressing <Esc>.
The Protect MUX must first be placed in the OOS, Maintenance service state before
Linked Provisioning automatically provisions the unit. Perform the following
procedure to place the module in the OOS, Maintenance mode:
6. From the System Controller Menu select option 2,
Common B – [STS-1MX]
, and
press <Enter>.
7. From the Protect MUX Menu select option 2,
Provisioning
, and press <Enter>.
8. From the Provisioning Menu select option 1,
Service State
, and press <Enter>.
9. From the Service State Menu select option 2,
Out-of-Service
, Maintenance.
10. Return to the Protect MUX Provisioning menu by pressing <Esc>.
The Protect MUX in slot B should now be provisioned with the identical settings as
the Primary MUX in slot A.
1.7.1
Follow-up Procedure
This completes the procedure for provisioning the Total Access 3000 STS-1
Multiplexer Module. Proceed to NTP-505 to place the units In-Service. If this
procedure was called out from another document, return to that document and
continue.