Total Access
®
3000/3010 System Manual
6TAATP601-1E
TOTAL ACCESS 3000/3010
ATP-601
Page 4 of 4
© 2002, ADTRAN, Inc.
1.3
Acceptance Test Checklist for ATP-601
1.3.1
Total Access 3000/3010 Shelf Installation in a Central Office
Checklist
Test Step
Completed (Initial)
1. Verify DSX-1 Wiring
2. Verify MDF Wiring
3. Verify Timing Connections
4. Verify Fan Operation
5. Verify Alarm Relay Output Connections
6. Verify Inter-Shelf Communication
7. Verify External Modem Connection
8. Verify OSS Connections
9. Verify IP LAN Connection
NOTE
Write N/A by any step which is not applicable to the installed configuration.
Comments
Installation Engineer Sign-off
Name (print):
Date Completed:
Signature:
Customer Sign-off
Name (print):
Date Accepted:
Signature: