1-1
INFORMATION FOR PREPARATION
Attention on Operation
z
All washers, oil rings, clamp rings, opening pins
shall be duly replaced by a new item
when dismounted.
z
Locking of all screws, nuts, cross screws shall be performed in the order of first the large
screws and then the small ones and from inside to outside in opposite angles by tightening
the torque locks.
z
All items must use original parts, pure oil and greases.
z
All service shall use special tools and general tools to repair.
z
All dismounted items requiring for checks shall be duly cleaned and for assembly, all
items shall be duly lubricated.