119
See 3.8 data management.
3. Add Temperature Source
4. Test Process
Insert the two thermometers vertically into the temperature field and install them at A and O points, after
the temperature is stable, click
for reading repeat these steps 4 times.
Scroll down the data field to section B, position sensors correctly and take 4 meausrements and move to
the next sections.
According to the above process, when the data acquisitions of all position points are completed, click
to check the statistic data, and click
to save test record.
4.4.5 Furnace radial uniformity test
1. Test Settings
See the test settings of dry well radial uniformity test.
2. Data Management
Summary of Contents for ADT286
Page 1: ......
Page 20: ...19 1 3 Base Structure Picture 1 ADT286 Mainframe...
Page 22: ...21 Picture 2 Connection of inserting and unplugging of embedded scanners...
Page 23: ...22 1 3 1 ADT286 TS Multi channel temperature signal scanner Picture 3 Temperature Device...
Page 25: ...24 1 3 2 ADT286 PS Multi channel process signal scanner Picture 4 Process Device...
Page 129: ......