www.adblighting.com
Quick Start - page 4
Issue 1.0
2. Description of the Unit
2.1 Contractor's Compartment
– Supply
Front access only is required. Cable entry is possible through bottom and top of the
cabinet. Cover panels for the unused cable entry/ exit apertures are supplied.
In order to gain maximum space to access
the cabinet for installation and maintenance
purposes, remove the two doors, loosen the
16 crosshead screws in the back and 3 left +
right at the bottom and dismount the entire
card cage in one piece.
Mounting the cabinet, first insert the card
cage,
enter two power modules to align
the rack
and fasten the 16 screws. Put the
doors in place and
reconnect the doors
earth connection
.
Summary of Contents for EURODIM TWIN TECH
Page 1: ...Installation Manual V 1 2 EURODIM Twin Tech M 3213 1106 03 213 Lighting Technologies ...
Page 2: ......
Page 6: ...EURODIM TWIN TECH www adblighting com Installation manual Page 4 Version 1 2 2 DESCRIPTION ...
Page 61: ...EURODIM TWIN TECH www adblighting com Installation manual Page 59 Version 1 2 Notes ...
Page 62: ...EURODIM TWIN TECH www adblighting com Installation manual Page 60 Version 1 2 Notes ...
Page 63: ......
Page 65: ...EURODIM Twin Tech SF 3213 1106 03 213 Lighting Technologies Quick Start Guide Issue 1 0 ...
Page 66: ......
Page 83: ...www adblighting com Quick Start page 17 Issue 1 0 6 Menu Tree Structure ...
Page 98: ...www adblighting com Quick Start page 32 Issue 1 0 Personal Notes ...
Page 99: ......
Page 101: ...User Manual V 1 1 EURODIM Twin Tech M 3213 1106 53 213 Lighting Technologies ...
Page 102: ......
Page 165: ......