166
Copyright © Acronis, Inc., 2000-2010
3.
Effective:
From:
05/13/2009
. The task will be started on the nearest Friday at 10 PM.
To:
11/13/2009
. The task will be performed for the last time on this date, but the task itself will
still be available in the Tasks view after this date. (If this date were not a Friday, the task would
be last performed on the last Friday preceding this date.)
This schedule is widely used when creating a custom backup scheme. The "One day in the week"-like
schedule is added to the full backups, while the incremental backups are scheduled to be performed
on workdays. For more details, see the Full and incremental backups plus cleanup example in the
Custom backup scheme (p. 206) section.
"Workdays" schedule
Run the task every week on workdays: from Monday through Friday. During a workday, the task
starts only once at 9 PM.
The schedule's parameters are thus set up as follows.
1.
Every:
1
week(s) on:
<Workdays>
- selecting the <Workdays> check box automatically selects the
corresponding check boxes (
Mon
,
Tue
,
Wed
,
Thu
, and
Fri
), and leaves the remaining ones
unchanged.
2.
Once at:
09:00:00 PM
.
3.
Effective:
From:
empty
. If you have created the task, say on Monday at 11:30 AM, the task will be started
on the same day at 9 PM. If the task was created, say on Friday after 9 PM, then it will be started
for the first time on the nearest workday (Monday in our example) at 9 PM.
End date:
empty
. The task will be restarted for an indefinite number of weeks.
This schedule is widely used when creating a custom backup scheme. The "Workdays"-like schedule
is added to the incremental backups, while the full backup is scheduled to be performed one day in
the week. For more details, see the Full and incremental backups plus cleanup example in the
Custom backup scheme (p. 206) section.
Several weekly schedules for one task
In the case when the task needs to be run on different days of the weeks with different time
intervals, consider adding a dedicated schedule to every desired day of the week, or to several days.
For example, you need the task to be run with the following schedule:
Monday: twice at 12 PM (noon) and 9 PM
Tuesday: every 3 hours from 9 AM till 9 PM
Wednesday: every 3 hours from 9 AM till 9 PM
Thursday: every 3 hours from 9 AM till 9 PM
Friday: twice at 12 PM and 9 PM (i.e. same as on Monday)
Saturday: once at 9 PM
Sunday: once at 9 PM
Combining the identical times, the following three schedules can be added to the task:
First schedule
1.
Every:
1
week(s) on:
Mon
,
Fri
.
2.
Every:
9
hours