179
Copyright © Acronis, Inc., 2000-2010
2
Warning
Last result is "Succeeded
with warning"
View the log to read the warnings -> [optionally] Perform
actions to prevent the future warnings or failure.
3
OK
Last result is
"Succeeded", "-", or
"Stopped"
No action is required.
The "-" state means that the task has never been started or has
been started, but has not finished yet and so its result is not
available.
6.1.2.2
Working with backup plans and tasks
Actions on backup plans and tasks
The following is a guideline for you to perform operations with backup plans and tasks.
To
Do
Create a new backup plan,
or a task
Click
New
, then select one of the following:
Backup plan (p. 188)
Recovery task (p. 212)
Validation task (p. 233)
View details of a plan/task
Backup plan
Click
View details
.
In the
Plan Details
(p. 185) window, review the plan details.
Task
Click
View details
.
In the
Task Details
(p. 183) window, review the task details.
View plan's/task's log
Backup plan
Click
View log
.
You will be taken to the
Log
(p. 186) view containing the list of the plan-related
log entries.
Task
Click
View log
.
You will be taken to the
Log
(p. 186) view containing the list of the task-related
log entries.