In the case when the task needs to be run on different days or weeks with different time intervals
depending on the month, consider adding a dedicated schedule to every desired month or several
months.
Suppose that the task goes into effect on 11/01/2009.
During northern winter, the task runs once at 10PM on every workday.
During northern spring and autumn, the task runs every 12 hours on all workdays.
During northern summer, the task runs every first and fifteenth of every month at 10 PM.
Thus, the following three schedules are added to the task.
First schedule
1.
Months:
December
,
January
,
February
.
2.
On:
<All> <All workdays>
3.
Once at:
10:00:00 PM
.
4.
Effective:
From:
11/01/2009
.
To:
not set
.
Second schedule
1.
Months:
March
,
April
,
May
,
September
,
October
,
November
.
2.
On:
<All> <All workdays>
.
3.
Every:
12
hours
From:
12:00:00 AM
Until:
12:00:00 PM
.
4.
Effective:
From:
11/01/2009
.
To:
not set
.
Third schedule
1.
Months:
June
,
July
,
August
.
2.
Days:
1
,
15
.
3.
Once at:
10:00:00 PM
.
4.
Effective:
From:
11/01/2009
.
To:
not set
.
5.4
Advanced scheduling settings
The following advanced settings are available when setting up a daily, weekly, or monthly schedule in
a backup policy.
Use Wake-On-LAN
When this setting is enabled, Acronis Backup & Recovery 10 Management Server will use the Wake-
On-LAN (WOL) functionality to wake up turned-off registered machines when a backup, cleanup or
validation is scheduled to start. If the backup task on each machine starts with a delay (see the next
setting), the management server will wake up the machines according to those delays.