5 System troubleshooting
138
First steps checklist
•
AC power available at the wall outlet?
•
Are the power supplies plugged in? Check the power cable(s) on
the back of the chassis and at the AC source.
•
Are all cables correctly connected and secured?
•
Is the processor fully seated in the socket on the mainboard?
•
Are all standoffs in the proper location and not touching any
components, causing a potential short?
•
Are all expansion boards fully seated in their slots on the
mainboard?
•
Are all jumper settings on the mainboard correct?
•
Are all jumper and switch settings on expansion boards and
peripheral devices correct? If applicable, ensure that there are no
conflicts - for example, two expansion boards sharing the same
interrupt.
•
Are all peripheral devices installed correctly?
•
If the system has a hard disk drive, is it properly formatted or
configured?
•
Are all device drivers properly installed?
•
Are the configuration settings made in BIOS setup correct?
•
Is the operating system properly loaded? Refer to the operating
system documentation.
•
Did you press the system power button on the front panel to turn
the server on (power indicator should be lit)?
•
Is the system power cord properly connected to the system and
plugged into an outlet for 110-240 V?
•
Are all integrated components from the tested components lists?
Check the tested memory, and chassis lists, as well as the supported
hardware and operating system list.
Summary of Contents for Altos R920 Series
Page 1: ...Acer Altos R920 Series User s Guide ...
Page 18: ...xviii SAS configuration utility 180 SAS RAID configuration utility 182 Index 185 ...
Page 19: ...1 System tour ...
Page 47: ...2 System setup ...
Page 55: ...3 System upgrade ...
Page 60: ...3 System upgrade 42 To install the front bezel Slide the front bezel onto the chassis ...
Page 115: ...4 System BIOS ...
Page 153: ...5 System troubleshooting ...
Page 166: ...5 System troubleshooting 148 ...
Page 167: ...Appendix A Rack mount configuration ...
Page 168: ...This appendix shows you how to set up the Altos R920 system in a rack mount configuration ...
Page 176: ...Appendix A Rack mount configuration 158 6 Fully extend the mounting rails on the rack ...
Page 180: ...Appendix A Rack mount configuration 162 ...
Page 181: ...Appendix B Memory configuration ...
Page 195: ...Appendix C SAS and SAS RAID configuration utilities ...
Page 196: ...This appendix gives an overview of the RAID configuration utilities supported by your server ...
Page 202: ...Appendix C SAS and SAS RAID configuration utilities 184 ...
Page 206: ...188 ...