| Installation –
Installing and connecting the E3BLTE1
26
Proceed as follows:
1
Open the housing cover of the wallbox using the tri-
angular key and lower it.
T
T
T
2
Disconnect the wallbox from the electricity supply
via the integrated RCCB and MCB.
3
Locate the 5V USB switch of the SBC on the in-
side of the housing cover, and guide the cable tie
through the oval openings in the cover lining above
it.
MODBUS
EN1
MODBUS
ME
TER
M
E
T
E
R
C
N
T
R
L
CONTROL
CONTROL
ME
TER
4
Insert the cable tie base into the opening located in
the area left of the USB switch.
MODBUS
EN1
MODBUS
ME
TER
M
E
T
E
R
C
N
T
R
L
CONTROL
CONTROL
ME
TER
5
Degrease the area of the internal lining intended for
the antenna using an alcohol swab.
MODBUS
EN1
MODBUS
ME
TER
M
E
T
E
R
C
N
T
R
L
CONTROL
CONTROL
ME
TER
6
Remove the rear protective foil from the LTE anten-
na and stick it to its intended position.