Operation Manual / TPL65VA10 / VA30
Maintenance
5
Cleaning components mechanically
5.5
Page 69
© Copyright 2016 ABB. All rights reserved.
N
ov
em
ber
2016
H
ZT
L2487_
EN
R
ev
is
ion
C
4. When the cartridge group is horizontal, secure one chain block from
one of the upper push-off threads using a swivel lifting eye and sus-
pend from the second crane.
5. Tighten chain block until entire cartridge group is suspended from
second crane.
6. Remove loop from first crane.