Inspection work
3.2
Inspection work includes preventive visual controls plus monitoring and
measuring work before and during commissioning. Inspections help detect
changes to the turbocharger. Machine damage can be avoided.
Inspection before commissioning
Check for correct functioning.
Inspect for damage.
Check oil filter for cleanliness before commissioning.
CAUTION
It is urgently recommended that the entire lubricating system be flushed
thoroughly with warm oil using a bypass pipe before starting up the first
time (commissioning) and after all service work on the lubricating sys-
tem.
It is urgently recommended that a running-in filter is used when running
in the engine and after all service work on the lubricating system.
Check the oil pressure in the oil supply lines.
Check that variable turbine geometry module can be adjusted.