Table of contents
Section 1 Introduction.....................................................................11
This manual...................................................................................... 11
Intended audience............................................................................ 11
Product documentation.....................................................................12
Product documentation set..........................................................12
Document revision history........................................................... 13
Related documents......................................................................14
Document symbols and conventions................................................14
Symbols.......................................................................................14
Document conventions................................................................15
IEC61850 edition 1 / edition 2 mapping............................................16
Section 2 Safety information.......................................................... 25
Symbols on the product....................................................................25
Warnings.......................................................................................... 25
Caution signs....................................................................................27
Note signs.........................................................................................27
Section 3 Available functions......................................................... 29
Main protection functions..................................................................29
Back-up protection functions............................................................ 29
Control and monitoring functions......................................................31
Communication.................................................................................36
Basic IED functions.......................................................................... 39
Section 4 Starting up......................................................................41
Factory and site acceptance testing................................................. 41
Commissioning checklist.................................................................. 41
Checking the power supply.............................................................. 42
Energizing the IED............................................................................42
Checking the IED operation.........................................................42
IED start-up sequence.................................................................43
Setting up communication between PCM600 and the IED...............43
Writing an application configuration to the IED.................................48
Checking CT circuits.........................................................................49
Checking VT circuits.........................................................................50
Using the RTXP test switch.............................................................. 50
Checking the binary I/O circuits........................................................51
Table of contents
Bay control REC670 2.1 IEC
1
Commissioning manual