Navigate to:
Main menu/Configuration/Communication/Station
communication/IEC61850-8-1/IEC61850–8–1:1
Set
Operation
to
On
,
PortSelGOOSE
and
PortSelMMS
to the port used
(for example
LANAB
).
2.
Enable redundant IEC 61850-8-1 communication for port AB and CD
2.1. Enable redundant communication.
Navigate to:
Main menu/Configuration/Communication/Ethernet
configuration/PRP:1
Set values for
Operation
,
IPAddress
and
IPMask
.
Operation
must be set to
On
.
The IED will restart after confirmation. Menu items
LANAB:1
and
LANCD:1
are hidden in local HMI after restart but are visible in PST
where the values for parameter
Mode
is set to
Duo
.
3.
Enable IEC 61850-9-2LE (process bus) communication for port CD.
3.1. Set values for the rear port CD.
Navigate to:
Main menu/Configuration/Communication/Ethernet
configuration/LANCD:1
Set values for
Mode
,
IPAddress
and
IPMask
.
Mode
must be set to
IEC9-2
.
There are no settings needed for the IEC 61850-9-2LE communication in the local
HMI branch
Station communication
. Make sure that the optical fibres are connected
correctly. Communication is enabled whenever the merging unit starts sending data.
8.3
Verifying the communication
To verify that the communication is working a test/analyzing tool, for example ITT600, can be used.
Verifying redundant IEC 61850-8-1 communication
Ensure that the IED receives IEC 61850-8-1 data on both port AB and CD. Browse in
the local HMI to
Main menu/Diagnostics/Communication/Redundant PRP
and
check that both signals LAN-A-STATUS and LAN-B-STATUS are shown as
Ok
.
Remove the optical connection to one of the ports AB or CD. Verify that either signal
LAN-A-STATUS or LAN-B-STATUS (depending on which connection that was
removed) are shown as
Error
and the that other signal is shown as
Ok
. Be sure to re-
connect the removed connection after completed verification.
Section 8
1MRK 511 360-UEN A
Establishing connection and verifying the IEC 61850 communication
66
Bay control REC670 2.1 IEC
Commissioning manual