![ABB REACT-3.6-TL Product Manual Download Page 115](http://html.mh-extra.com/html/abb/react-3-6-tl/react-3-6-tl_product-manual_4163115.webp)
- 115 -
000568AG
7 - Operation
• Assisted setup - STEP 6
Settings related to energy management.
Energy consumption
- Power committed: setting related to the power of the electrical energy
supply expressed in kW.
Energy management policy
- Grid standard: set the grid standard of the country in which the REACT
is installed
- Energy management policy: set the way in which you want to manage
the energy produced by the PV plant, choosing from the following:
Management mode
Description
Maximisation
of self-consumption
The REACT system automatically manages
power flows in order to maximise self-con
-
sumption. Priority: Domestic loads, temporary
storage in battery, and lastly, power fed into
grid.
Zero injection
The REACT system automatically manages
power flows in order to avoid the injection of
energy to the grid. If the meter is disconnected
or not working the REACT's output power is
restricted to zero in order to avoid accidental
input to the grid.
Adjustable
The REACT system automatically manages
power flows in order to avoid feeding the grid
with power greater than:
P
DC
x P
lim
where P
DC
is the power of the photovoltaic ge-
nerator (W) and P
lim
is the output power limit
with respect to P
DC
(%). The two variables can
be set during the REACT commissioning sta-
ge.
KfW
The REACT system automatically manages
power flows in order to fulfil the requirements
of the KfW incentive programme available in
Germany.
- Photovoltaic power P
DC
: insert the power value of the photovoltaic sy-
stem (kWp) installed
- Output power restriction compared to P
DC
: percentage AC power restric-
tion with reference to power installed
Electrical energy tariffs
- Currency: select the currency of the country in which the system is
installed
- Average energy cost (€/kWh): enter an average value for the energy
cost that is shown on the bill
- Input incentive (€/kWh): enter the value of the incentive (if applicable)
for energy fed into the grid.
Save
Back
Energy Management
Energy consumption
Energy management policy
Electrical energy tariffs
Power committed
Grid standard
Type
Maximisation of self-consumption
Power installed P
DC
Lim. Output power compared to P
DC
Currency
Average energy cost
Input incentive
Скачано
с
сайта
интернет
магазина
https://axiomplus.com.ua/