58 Electrical installation
10. Before you put the connector housing in place,
make sure that the rubber seal is in position in the
inverter frame.
11. Tighten the 4 screws to 4 N·m.
12. Tighten the cable gland of the connector housing
to 7.5 N·m.
13. If it is necessary, attach an additional PE
connector with a cable lug to the second PE
connection point.
To connect the AC cable:
10
11
12
Summary of Contents for PRO-33.0-TL Series
Page 1: ...ABB solar inverters Product manual PRO 33 0 TL string inverters ...
Page 4: ......
Page 10: ...10 Table of contents ...
Page 32: ...32 Hardware description ...
Page 40: ...40 Installation requirements ...
Page 70: ...70 Electrical installation ...
Page 74: ...74 Installation checklist ...
Page 110: ...110 Maintenance ...
Page 134: ...134 Navigation map The navigation map ...
Page 136: ...Contact us www abb com solarinverters 3AUA0000123261 Rev B EN 2015 06 18 ...