Electrical installation 53
Insulation test
Before the grid connection, the inverter measures the impedance between the DC
terminals and ground. If the impedance is less than the preset value, the inverter
shows a fault message and it does not connect to the grid.
Inverter
The inverter is tested for insulation between the main circuit and the chassis
(1,500 V
DC
) at the factory. Do not perform any voltage tolerance or insulation
resistance tests on any part of the inverter.
AC output cable
Before you connect the AC output cable, make sure that it obeys the local
regulations.
PV generator
Make sure that the insulation of the PV generator obeys the local regulations and the
manufacturer instructions. Fully disconnect the PV generator from the inverter during
the insulation test.
Summary of Contents for PRO-33.0-TL Series
Page 1: ...ABB solar inverters Product manual PRO 33 0 TL string inverters ...
Page 4: ......
Page 10: ...10 Table of contents ...
Page 32: ...32 Hardware description ...
Page 40: ...40 Installation requirements ...
Page 70: ...70 Electrical installation ...
Page 74: ...74 Installation checklist ...
Page 110: ...110 Maintenance ...
Page 134: ...134 Navigation map The navigation map ...
Page 136: ...Contact us www abb com solarinverters 3AUA0000123261 Rev B EN 2015 06 18 ...