Changing manipulator orientation ...............................................................
Assembling the cable tray .........................................................................
The cabling from the controller ..................................................................
2.6.2.2 Connectors on controller, IRC5 ......................................................
Inspection of cables and covers prior to start-up ...........................................
Starting the system for the first time ...........................................................
Creating and downloading a system ...........................................................
Setting upper and lower software limits for the track ......................................
Base frame configuration ..........................................................................
2.7.4.2 Configuration examples ................................................................
Configuration of additional load .................................................................
Replacing the grease cartridge in grease pump MEMOLUB
Configuration of grease pump MEMOLUB
.................................................
Check list for IRBT 2005 before commissioning ............................................
Maintenance schedule and expected component life ...............................................
Specification of maintenance intervals ........................................................
Maintenance schedule .............................................................................
Expected component life ..........................................................................
Cleaning the linear guides .........................................................................
Inspecting the automatic lubrication system .................................................
Emergency stop and stroke limit system ......................................................
Inspecting the cables and connectors .........................................................
Inspecting the cable chain ........................................................................
Inspecting the cables and connectors .........................................................
Inspecting the mechanical stops ................................................................
Inspecting the gear wheel, gearbox and backlash ..........................................
Replacing SMB battery .............................................................................
Replacing the motor, gearbox and gear wheel ........................................................
Replacing the motor ................................................................................
Replacing the gearbox .............................................................................
Replacing the gear wheel ..........................................................................
6
Product manual - IRBT 2005
3HAC051130-001 Revision: F
© Copyright 2015 - 2018 ABB. All rights reserved.
Table of contents
Summary of Contents for IRBT 2005
Page 1: ...ROBOTICS Product manual IRBT 2005 ...
Page 8: ...This page is intentionally left blank ...
Page 44: ...This page is intentionally left blank ...
Page 148: ...This page is intentionally left blank ...
Page 284: ...This page is intentionally left blank ...
Page 286: ...This page is intentionally left blank ...
Page 289: ......