
6.4.3
Do an inspection of the PE connection
Preliminary requirements
•
Only do this procedure
when a different
procedure refers to this
procedure.
•
Procedure
1. Use a multimeter to make sure that the terminals X1-1 and X1-2 are not earthed.
2. If the terminals are earthed, then contact the manufacturer. Refer to
6.4.4
Connect the 120 V cable for the precommissioning mode
Preliminary requirements
•
Only do this procedure
when a different
procedure refers to this
procedure.
•
AC single-phase cable. Refer
to section
•
Ferrules
•
Torque screwdriver, cross
•
Wire cutter
•
Wire stripper pliers
•
Crimp pliers
•
Procedure
1. Install the ferrules on the wires. Refer
to section
.
2. Loosen the screws of the terminal
block X-1.
3. Connect the wires to the terminals.
Wire
Connect to terminal
L1 wire (A)
X1-1 (D)
Neutral wire (B)
X1-2 (E)
PE wire (C)
X1-3 (F)
4. Tighten the screws to the correct torque. Refer to section
C
A
B
F
E
D
Installation
HVC 200/300/360-EN | 002
59