
Procedure
1. Move the forks of the forklift truck in the gaps at the side of the cabinet.
2. Move the cabinet to the correct location.
4.2
Unpacking
4.2.1
Unpacking procedure
Preliminary requirements
•
Installation engineer
Procedure
1. Do a check on the transport sensors.
2. Remove the packaging material. To discard the packaging material, refer to
section
3. Make sure that all parts are delivered according to the order. Refer to the order
and section
.
4. If you find damage or the parts are not according to the order, contact the local
representative of the manufacturer.
4.2.2
Do a check of the transport sensors
Preliminary requirements
•
Installation engineer
Transport, handling and unpacking
HVC 200/300/360-EN | 002
33