X1-1
X1-2
X1-3
A
A
PE-neutral wire
6.4.2
Precommissioning mode - general procedure
Preliminary requirements
•
The power cabinet is
mechanically installed.
Refer to section
•
The power cabinet is
electrically installed. Refer
to section
.
•
A separate
single phase 120 V AC
cable from the AC power
grid is available in the
power cabinet.
•
There is no
3 phase 480 V AC power
supply from the AC power
grid.
•
Note: If the single phase 120 V AC cable from the AC grid is not installed,
contact the manufacturer. Refer to section
.
Procedure
1. Do an inspection of the PE connection. Refer to section
.
2. Connect the 120 V AC cable for the precommissioning mode. Refer to section
3. Do a check on the condition or the position of the electrical parts. Refer to
section
.
4. Set the precommissioning switch. Refer to section
Installation
58
HVC 200/300/360-EN | 002